Inventory the estate
What runs where, what depends on it, and what the recovery position actually is today.
Moving off ageing servers, or building the environment a new platform runs in. Migration, hosting, and the work that keeps it available once it is live.
A server under somebody's desk holds a system the operation depends on. The recovery plan is a backup nobody has restored. The person who configured it left two years ago.
It works until it does not, and the cost of the day it stops is measured across the whole operation rather than in the server.
Modernisation runs in stages rather than as one migration weekend. Each stage leaves the estate working, which is what makes it safe to stop between them.
Environments defined in code, so what runs in production is described rather than remembered. Monitoring that shows the state of the system before a user reports it, backups that are tested by restoring them, and access granted by role and reviewed.
Includes
What runs where, what depends on it, and what the recovery position actually is today.
Ordered by risk and dependency, so each stage leaves a working estate behind it.
Run in parallel where the system allows it, with a tested route back before each cutover.
Monitoring, patching, backup testing, and a cost review that keeps the bill matched to the load.
Not automatically. It is cheaper where load varies and more expensive where it is flat and predictable. We model your actual usage against current costs before recommending a move, and sometimes the answer is to stay.
Often, by running both environments in parallel and cutting over once the new one is proven. Where a system genuinely cannot run twice, the window is planned and the route back is tested first.
AWS, Azure, and Google Cloud all do this work. The decision usually comes down to what your team already knows, what your other systems sit beside, and the commercial terms available to you.
Where you want that. Monitoring, patching, and incident response sit under managed systems, or handed to your team with full documentation.
Describe what is slowing the operation down. We will come back with the approach, the scope, and what it costs.
Get in touch